@TheDock Phase two

“Due to the tight construction site, logistical challenges and close proximity to the public highway, we have utilised mast climbers on the scheme as opposed to a full scaffold. These mast climbers have boosted productivity and enabled us to provide safe and effective access to the full building envelope.” – Dave Blades, Director.

@theDock Building A

Mike Beal, Construction Director said: “We are delighted to be back on site constructing the next phase of the @TheDock development. As a Hull-headquartered business, it’s always a great privilege to construct iconic buildings in our home city.

“The change in the Fruit Market area is phenomenal and is testament to both private and public sector efforts to realise the vision. We can’t wait to see it take shape.”